This website is intended to satisfy the requirement under the CCR Rule (section 40 CFR Part 257.107) to maintain a publicly accessible internet site (CCR website) containing the information specified in that section. Additional information will be posted when it is available.
-
-
-
2020 Havana Annual Surface Inspection Certification Report-East Ash Pond Cells 1,2,3,4 (pdf)
2020 Havana Annual Groundwater Monitoring and Corrective Acton Report (pdf)
2020 Havana Annual CCR Fugitive Dust Control Report-East Ash Pond Cells 1, 2, 3, 4 (pdf)
Illinois 12-Month Coal Combustion Byproducts Report-Havana Power Station (pdf)
2020 Figure 1 Havana Eash Ash Pond Monitoring Well Location Map (pdf)
2020 Havana CCR East Ash Pond Annual GW Monitoring & CA Report_Draft (pdf)
-
-
2018 Havana East Ash Pond Assessment Monitoring Notification (pdf)
2018-Havana-Annual Fugitive Dust Control Report-East Ash Pond Cells 1, 2, 3, 4 (pdf)
2018-Havana-Location Restriction Demonstration-East Ash Pond Cells 1, 2, 3, 4 (pdf)
2018 Havana CCR East Ash Pond Annual GW Monitoring & CA Report (pdf)
-
2017 10 17 Havana CCR East Ash Pond (Cells 1, 2, 3, and 4) Statistical Plan Certification (pdf)
2017 10 17 Havana CCR East Ash Pond Monitoring System Certification Letter (pdf)
2017 Havana CCR Annual Fugitive Dust Control Report (pdf)
2017 Havana CCR East Ash Pond Annual Groundwater Monitoring and Corrective Action Report (pdf)
2017 Havana CCR East Ash Pond Dam Summary Report (pdf)
2017 Havana CCR Surface Impoundment EAP (pdf)
2017 10 17 Havana East Ash Pond (Cells 1, 2, 3, and 4)_Well Construction Records (pdf)
2017 10 17 Havana East Ash Pond Sampling and Analysis Plan (pdf)
2017 10 17 Havana Hydrogeologic Monitoring Plan-z (pdf)
2017 10 17 Havana Hydrogeologic Monitoring Plan (pdf)
2017 10 17 Monitoring System Cert letter Dynegy Havana EAP (pdf)
2017 10 17 Statistical Analysis Plan_Dynegy Midwest Generation, LLC (pdf)
2017 10 17 Statistical Plan Certification Havana East Ash Pond (Cells 1, 2, 3, and 4) (pdf)
-
Havana CCR Notice of Availability (pdf)
East Ash Pond Structural Stability Assessment (pdf)
East Ash Pond Safety Factor Assessment (pdf)
East Ash Pond Post-Closure Plan (pdf)
East Ash Pond Liner Evaluation (pdf)
East Ash Pond Inflow Design and Flood Control System Plan (pdf)
East Ash Pond Hazard Potential Assessment (pdf)
East Ash Pond Closure Plan (pdf)
2016 Havana CCR Fugitive Dust Control Annual Report (pdf)
2016 Havana CCR Annual Dam Inspection Report East Ash Pond (pdf)
2016 10 Havana East Ash Pond FOS Cert Report (pdf)
2016 10 Havana East Ash Pond Full CCR Cert Report (pdf)
2016 10 Havana East Ash Pond Geotechnical report (pdf)
2016 10 Havana East Ash Pond Hazard Assessment Report (pdf)
2016 10 Havana East Ash Pond IDF Cert Report (pdf)
2016 10 Havana East Ash Pond Initial Hazard Assessment (pdf)
2016 10 Havana East Ash Pond Liner Design Criteria Report (pdf)
2016 10 Havana East Ash Pond Post-Closure Plan (pdf)
2016 10 Havana East Ash Pond SS Cert Report (pdf)
-