This website is intended to satisfy the requirement under the CCR Rule (section 40 CFR Part 257.107) to maintain a publicly accessible internet site (CCR website) containing the information specified in that section. Additional required information will be posted when it is available.
-
-
2022 Annual Inspection Landfill 11 Rpt (pdf)
2022 No inspection memo Ponds 3A-10 9-26-22 (pdf)
2022 Remedy Selection Report (pdf)
2022 Closure Plan Pond 6 (pdf)
2022 Closure Plan Pond 7-7A (pdf)
2022 Sign in Sheet Killen-Stuart CCR Rule Pub. Mtg. 02-23-22 (pdf)
-
2021 Annual Inspection Landfill 11 Report (pdf)
2021 Annual Inspection Landfill 9 Report (pdf)
2021 Stuart Pond 3A Dam Inspection report (pdf)
2021 Stuart Pond 5 Dam Inspection report (pdf)
2021 Stuart Pond 6 Dam Inspection report (pdf)
2021 Stuart Pond 7-7A Dam Inspection report (pdf)
2021 Stuart Pond 10 Dam Inspection report (pdf)
2021 Carter Hollow Annual GW Monitoring and Corrective Action Report (pdf)
2021 Stuart CCR Fugitive Dust Control Report (pdf)
2021 -Stuart Groundwater Monitoring and Corrective Action Report (pdf)
Landfill-9-CCR-Run-on-Control-Plan (pdf)
Landfill-11-Run-on-Control-Plan (pdf)
Pond 6 Hazard-Potential-Classification-Assessment (pdf)
Pond 6-Inflow-Design-Flood-Control-System-Plan (pdf)
Pond-3A-Hazard-Potential-Classification-Assessment (pdf)
Pond-3A-Inflow-Design-Flood-Control-System-Plan (pdf)
Pond-3A-Structural-Stability-Assessment (pdf)
Pond-5-Hazard-Potential-Classification-Assessment (pdf)
Pond-5-Inflow-Design-Flood-Control-System-Plan (pdf)
Pond-5-Structural-Stability-Assessment (pdf)
Pond-6-Structural-Stability-Assessment (pdf)
Pond-7-Hazard-Potential-Classification-Assessment-2021 (pdf)
Pond-7-Inflow-Design-Flood-Control-System-Plan (pdf)
Pond-7-Structural-Stability-Assessment (pdf)
Pond-10-Hazard-Potential-Classification-Assessment-2021 (pdf)
Pond-10-Inflow-Flood-Control-System-Plan (pdf)
Pond-10-Structural-Stability-Assessment Pond 10 (pdf)
Safety-Factor-Assessment (pdf)
Safety-Factor-Assessment-Appendix-A (pdf)
Safety-Factor-Assessment-Appendix-B (pdf)
Safety-Factor-Assessment-Appendix-C (pdf)
-
2020 Annual-Dam-Insp-Pond-7-7A (pdf)
2020 Annual-Dam-Insp-Pond-10 (pdf)
2020 Annual-Inspection-Report-Carter-Hollow-Landfill (pdf)
2020 Annual-Inspection-Report-Landfill-9 (pdf)
2020 Annual-Inspection-Report-Landfill-11 (pdf)
2020 Fugitive-Dust-Control-Report-Stuart (pdf)
2020 Stuart-1st-Rem-Progress-Rpt_P5-P7-P10-LF11 (pdf)
2020 Stuart-Annual-GW-Monitoring-and-Corrective-Action-Report (pdf)
2020 Stuart-Annual-GW-Monitoring-and-Corrective-Action-Report-Appendix-A (pdf)
2020 Stuart-Annual-GW-Monitoring-and-Corrective-Action-Report-Appendix-B (pdf)
2020 Stuart-Corrective-Measures-Assessment-rev (pdf)
2020 Stuart-Fugitive-Dust-Control-Plan (pdf)
2020 Stuart-GW-Monitoring-System-Certification (pdf)
2020-Annual-Dam-Insp-Pond-3A (pdf)
-
2019 Annual-Inspection-Report-Carter-Hollow-Landfill (pdf)
2019 Annual-Inspection-Report-Stuart-Landfill-9 (pdf)
2019 Annual-Inspection-Report-Stuart-Landfill-11 (pdf)
2019-Annual-Inspection-Report-Stuart-Pond-3A (pdf)
2019 Annual-Inspection-Report-Stuart-Pond-5 (pdf)
2019 Annual-Inspection-Report-Stuart-Pond-6 (pdf)
2019 Annual-Inspection-Report-Stuart-Pond-7 (pdf)
2019 Annual-Inspection-Report-Stuart-Pond-10 (pdf)
2019 Assessment-Monitoring-Program-Notification-Stuart-Station-Pond-6 (pdf)
2019 CMA-60-Day-Extension-Certification (pdf)
2019 CMA-Stuart-Landfill-11 (pdf)
2019 EAP-Stuart-Killen-Annual-Meeting (pdf)
2019 Fugitive-Dust-Control-Report-Stuart (pdf)
2019 Initiation-of-Assessment-of-Corrective-Measures-Notification (pdf)
2019 JMSS-Annual-Groundwater-Monitoring-and-Corrective-Action-Report-P3A-P6 (pdf)
2019 JMSS-Annual-GW-Monitoring-and-Corrective-Action-Report-LF9-LF11-P10-P7-P5 (pdf)
2019 SSL-Notification-JMSS-Landfill-11 (pdf)
2019 SSL-Notification-JMSS-Pond-5 (pdf)
-
2018 Annual-Inspection-Report Pond 6 (pdf)
2018 Annual-Inspection-Report-Stuart-Carter-Hollow-Landfill (pdf)
2018 Annual-Inspection-Report-Stuart-Landfill-9 (pdf)
2018 Annual-Inspection-Report-Stuart-Landfill-11 (pdf)
2018-Annual-Inspection-Report-Stuart-Pond-3A (pdf)
2018 Annual-Inspection-Report-Stuart-Pond-7 (pdf)
2018 Annual-Inspection-Report-Stuart-Pond-10 (pdf)
2018 Assessment-Monitoring-Program-Notification-Stuart-Station (pdf)
2018 CHLF-CCR-Location-Restriction-Demonstration (pdf)
2018 EAP-Stuart-Killen-Annual-Meeting (pdf)
2018 Fugitive-Dust-Control-Report-Stuart (pdf)
2018 JMSS-Annual-Groundwater-Monitoring-and-Corrective-Action-Report-P3A-P6 (pdf)
2018 JMSS-Annual-GW-Monitoring-and-Corrective-Action-Report-LF9-LF11-P10-P7-P5 (pdf)
2018 JMSS-Landfill-9-Location-Restrictions-Memo (pdf)
2018 JMSS-Landfill-9-Unstable-Area-Certification (pdf)
2018 JMSS-Landfill-11-Location-Restrictions-Memo (pdf)
2018 JMSS-Landfill-11-Unstable-Area-Certification (pdf)
2018 JMSS-Pond-3A-Aquifer-Separation-Certification (pdf)
2018 JMSS-Pond-3A-Fault-Area-Certification (pdf)
2018 JMSS-Pond-3A-Location-Restrictions-Memo-Aquifer (pdf)
2018 JMSS-Pond-3A-Location-Restrictions-Memo-Fault-Areas (pdf)
2018 JMSS-Pond-3A-Location-Restrictions-Memo-Seismic-Impact-Zones (pdf)
2018 JMSS-Pond-3A-Location-Restrictions-Memo-Unstable-Areas (pdf)
2018 JMSS-Pond-3A-Location-Restrictions-Memo-Wetlands (pdf)
2018 JMSS-Pond-3A-Seismic-Impact-Zone-Certification (pdf)
2018 JMSS-Pond-3A-Unstable-Area-Certification (pdf)
2018 JMSS-Pond-3A-Wetlands-Certification (pdf)
2018 JMSS-Pond-5-Fault-Area-Certification (pdf)
2018 JMSS-Pond-5-Location-Restrictions-Memo-Aquifer (pdf)
2018 JMSS-Pond-5-Location-Restrictions-Memo-Fault-Areas (pdf)
2018 JMSS-Pond-5-Location-Restrictions-Memo-Seismic-Impact-Zones (pdf)
2018 JMSS-Pond-5-Location-Restrictions-Memo-Unstable-Areas (pdf)
2018 JMSS-Pond-5-Location-Restrictions-Memo-Wetlands (pdf)
2018 JMSS-Pond-5-Non-compliant-Aquifer-Separation-Certification (pdf)
2018 JMSS-Pond-5-Seismic-Impact-Zone-Certification (pdf)
2018 JMSS-Pond-5-Unstable-Area-Certification (pdf)
2018 JMSS-Pond-5-Wetlands-Certification (pdf)
2018 JMSS-Pond-6-Fault-Area-Certification (pdf)
2018 JMSS-Pond-6-Location-Restrictions-Memo-Aquifer (pdf)
2018 JMSS-Pond-6-Location-Restrictions-Memo-Fault-Areas (pdf)
2018 JMSS-Pond-6-Location-Restrictions-Memo-Seismic-Impact-Zones (pdf)
2018 JMSS-Pond-6-Location-Restrictions-Memo-Unstable-Areas (pdf)
2018 JMSS-Pond-6-Location-Restrictions-Memo-Wetlands (pdf)
2018 JMSS-Pond-6-Non-compliant-Aquifer-Separation-Certification (pdf)
2018 JMSS-Pond-6-Seismic-Impact-Zone-Certification (pdf)
2018 JMSS-Pond-6-Unstable-Area-Certification (pdf)
2018 JMSS-Pond-6-Wetlands-Certification (pdf)
2018 JMSS-Pond-7-Fault-Area-Certification (pdf)
2018 JMSS-Pond-7-Location-Restrictions-Memo-Aquifer (pdf)
2018 JMSS-Pond-7-Location-Restrictions-Memo-Fault-Areas (pdf)
2018 JMSS-Pond-7-Location-Restrictions-Memo-Seismic-Impact-Zones (pdf)
2018 JMSS-Pond-7-Location-Restrictions-Memo-Unstable-Area (pdf)
2018 JMSS-Pond-7-Location-Restrictions-Memo-Wetlands (pdf)
2018 JMSS-Pond-7-Non-compliant-Aquifer-Separation-Certification (pdf)
2018 JMSS-Pond-7-Seismic-Impact-Zone-Certification (pdf)
2018 JMSS-Pond-7-Unstable-Area-Certification (pdf)
2018 JMSS-Pond-7-Wetlands-Certification (pdf)
2018 JMSS-Pond-10-Fault-Area-Certification (pdf)
2018 JMSS-Pond-10-Location-Restrictions-Memo-Aquifer (pdf)
2018 JMSS-Pond-10-Location-Restrictions-Memo-Fault-Areas (pdf)
2018 JMSS-Pond-10-Location-Restrictions-Memo-Seismic-Impact-Zones (pdf)
2018 JMSS-Pond-10-Location-Restrictions-Memo-Unstable-Areas (pdf)
2018 JMSS-Pond-10-Location-Restrictions-Memo-Wetlands (pdf)
2018 JMSS-Pond-10-Seismic-Impact-Zone-Certification (pdf)
2018 JMSS-Pond-10-Unstable-Area-Certification (pdf)
-
2017 Annual-Inspection-Report-Stuart-Carter-Hollow-Landfill (pdf)
2017 Annual-Inspection-Report-Stuart-Landfill-9 (pdf)
2017 Annual-Inspection-Report-Stuart-Landfill-11 (pdf)
2017-Annual-Inspection-Report-Stuart-Pond-3A (pdf)
2017 Annual-Inspection-Report-Stuart-Pond-5 (pdf)
2017 Annual-Inspection-Report-Stuart-Pond-6 (pdf)
2017 Annual-Inspection-Report-Stuart-Pond-7 (pdf)
2017 Annual-Inspection-Report-Stuart-Pond-10 (pdf)
2017 EAP-Stuart-Killen-Annual-Meeting (pdf)
2017 Fugitive-Dust-Control-Plan-Stuart (pdf)
2017 Fugitive-Dust-Control-Report-Stuart (pdf)
2017 JMSS-Annual-Groundwater-Monitoring-and-Corrective-Action-Report (pdf)
2017 JMSS-GW-Monitoring-System-Certification (pdf)
2017 JMSS-Statistical-Data-Analysis-Plan (pdf)
2017 Stuart-Ash-Pond-EAP (pdf)
2017 Time-Extension-to-Initiate-Closure Pond 3A and 10 (pdf)
-
2016 Annual-Inspection-Report-Stuart-Carter-Hollow-Landfill (pdf)
2016 Annual-Inspection-Report-Stuart-Landfill-9 (pdf)
2016 Annual-Inspection-Report-Stuart-Landfill-11 (pdf)
2016-Annual-Inspection-Report-Stuart-Pond-3A (pdf)
2016 Annual-Inspection-Report-Stuart-Pond-5 (pdf)
2016 Annual-Inspection-Report-Stuart-Pond-6 (pdf)
2016 Annual-Inspection-Report-Stuart-Pond-7 (pdf)
2016 Annual-Inspection-Report-Stuart-Pond-10 (pdf)
2016 Closure-Plan Carter Hollow Landfill (pdf)
2016 Closure-Plan Landfill 9 (pdf)
2016 Closure-Plan Landfill 11 (pdf)
2016 Closure-Plan Pond 3A (pdf)
2016 Closure-Plan Pond 5 (pdf)
2016 Closure-Plan Pond 6 (pdf)
2016 Closure-Plan Pond 7 (pdf)
2016 Closure-Plan Pond 10 (pdf)
2016 Fugitive-Dust-Control-Report (pdf)
2016 Hazard-Potential-Classification-Assessment Pond 3A (pdf)
2016 Hazard-Potential-Classification-Assessment Pond 5 (pdf)
2016 Hazard-Potential-Classification-Assessment Pond 6 (pdf)
2016 Hazard-Potential-Classification-Assessment Pond 7 (pdf)
2016 Hazard-Potential-Classification-Assessment Pond 10 (pdf)
2016 History-of-Construction Pond 3A (pdf)
2016 History-of-Construction Pond 5 (pdf)
2016 History-of-Construction Pond 6 (pdf)
2016 History-of-Construction Pond 7 (pdf)
2016 History-of-Construction Pond 10 (pdf)
2016 Inflow-Design-Flood-Control-System- Plan Pond 6 (pdf)
2016 Inflow-Design-Flood-Control-System-Plan Pond 3A (pdf)
2016 Inflow-Design-Flood-Control-System-Plan Pond 5 (pdf)
2016 Inflow-Design-Flood-Control-System-Plan Pond 7 (pdf)
2016 Inflow-Design-Flood-Control-System-Plan Pond 10 (pdf)
2016 Liner-Design - Pond 3A-5-6-7-10 (pdf)
2016 Post-Closure-Plan Carter Hollow Landfill (pdf)
2016 Post-Closure-Plan Landfill 9 (pdf)
2016 Post-Closure-Plan Landfill 11 (pdf)
2016 Post-Closure-Plan Pond 5 (pdf)
2016 Post-Closure-Plan Pond 6 (pdf)
2016 Post-Closure-Plan Pond 7 (pdf)
2016 Post-Closure-Plan Pond 10 (pdf)
2016 Run-on-and-Run-off-Control-System-Plan CHLF (pdf)
2016 Run-on-and-Run-off-Control-System-Plan Landfill 9 (pdf)
2016 Run-on-and-Run-off-Control-System-Plan Landfill 11 (pdf)
2016 Safety-Factor-Assessment 3A-5-6-7-10(pdf)
2016 Structural-Stability-Assessment Pond 3A (pdf)
2016 Structural-Stability-Assessment Pond 5 (pdf)
2016 Structural-Stability-Assessment Pond 6 (pdf)
-
2015 Stuart-Station-CCR-Location-Map (pdf)
2015 Annual-Inspection-Report-Stuart-Carter-Hollow-Landfill (pdf)
2015 Annual-Inspection-Report-Stuart-Landfill-9 (pdf)
2015 Annual-Inspection-Report-Stuart-Landfill-11 (pdf)
2015-Annual-Inspection-Report-Stuart-Pond-3A (pdf)
2015 Annual-Inspection-Report-Stuart-Pond-5 (pdf)